  "name": "What factors have the biggest impact on schedule for ground-up construction?",
  "description": "Key drivers include permitting timelines, availability of trades and materials, complexity of the design and site, change orders, and inspections or utility con",
  "url": "https://lineworkdevelopment.com/faq/what-factors-have-the-biggest-impact-on-schedule-for-ground-up-construction",
  "mainEntity": [
    {
      "@type": "Question",
      "name": "What factors have the biggest impact on schedule for ground-up construction?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Key drivers include permitting timelines, availability of trades and materials, complexity of the design and site, change orders, and inspections or utility connections that can only happen in a specific sequence. rsvc+2"
      }
    }
  ],